DS8000 Storage Remote Code Upgrade
Horário de abertura
-
Domingo
00:00 - 00:00
-
Segunda-feira
00:00 - 00:00
-
Terça-feira
00:00 - 00:00
-
Quarta-feira
00:00 - 00:00
-
Quinta-feira
00:00 - 00:00
-
Sexta-feira
00:00 - 00:00
-
Sábado
00:00 - 00:00
Sobre a empresa
IBM System Storage DS8000 OverviewDS8000 Code RecommendationNossa equipe
RCL Services
DS8000 Emergency RCL
Top services
As soon as possible
480 min
Select a random date and time and IBM will contact you within 30 min to discuss details and options based on availability.This service does not guarantee a slot earlier than what is available in the calendar. Depending on current availability and d
CHCC - DS8K Standard Code Load
240 min
CHCC - DS8K Transformation Code Load
360 min
CHCC - Full DS8K Transformation Code Load
720 min
CHCC - Full DS8K Standard Code Load
480 min
CHCC - DS8K Engineering Change
60 min
DS8K Standard Code Load Activation
240 min
IBM will contact client to perform Health-Check & Pre-Load anytime M-F during regular business hours or as defined in "Date and Time to perform Health-Check & Pre-Load activity. If you require HMC update to be performed in the same Pre-Loa
DS8K Transformation Activation
360 min
IBM will contact client to perform Health-Check & Pre-Load anytime M-F during regular business hours or as defined in "Date and Time to perform Health-Check & Pre-Load activity. *For DS8880s, Transformations should only be scheduled if th
DS8K Engineering Change (EC)
60 min
ICS (Install Corrective Service).Activities performed during this scheduled Engineering Change: Pre checks: (30 minutes) Standard checks to confirm machine is ready for the Engineering ChangeInstall Correct Service (IC
Any Available slot Mon-Fri
480 min
Select a random date and time and we will send you an email with any available slot during the week. IBM will perform the full code upgrade with 30 minutes notice without waiting for approval. Due to the dynamics of our schedule, we sometimes hav
Comentários/Avaliações
0 avaliações